Description
Description
Roberlo Multyfiller Express ME1 Standard Kit (1.5L) — 2K Acrylic Primer Filler 4:1
The Multyfiller Express ME1 (Light Grey) is a 2K acrylic primer filler designed for bodywork repair, delivering high isolating quality and excellent adhesion to putties, fillers, and properly sanded hardened paints. This kit includes P5000 Standard Hardener for general workshop conditions.
What’s Included (Kit Configuration)
- 1 × Multyfiller Express ME1 Primer — 1 Liter (Light Grey)
- 1 × P5000 Standard Hardener — 500 ml
| Component | Size | Role |
|---|---|---|
| Multyfiller Express ME1 | 1 L | 2K acrylic primer filler / surfacer base |
| P5000 Standard Hardener | 500 ml | Hardener for coatings (professional/industrial use) |
Key Benefits (Body Shop Workflow)
- High isolating quality + strong adhesion to putties, fillers, and properly sanded hardened paints.
- Flexible use: set it up as high build filler, primer surfacer, or non-sanding (with NS21).
- ME1 Light Grey helps create an even groundcoat before basecoat application.
- Extra hardener included: at a 4:1 ratio, 1L of primer requires 250 ml hardener—this kit includes 500 ml for added flexibility.
Mixing Ratios & Pot Life (P5000 Standard)
| Mode | Mix by Volume | Mix by Weight (TDS) | Viscosity (F/4 @ 20°C) | Pot Life (P5000) |
|---|---|---|---|---|
| High Build Filler | Multyfiller Express 4 : Hardener 1 (+ S322 0–10%) | 100 : 15 | 50 sec | 20–40 min* |
| Primer Surfacer | Multyfiller Express 4 : Hardener 1 (+ S322 0–10%) | 100 : 15 | 19 sec | 20–40 min* |
| Non-Sanding (with NS21) | Multyfiller Express 3 : Hardener 1.5 : NS21 1 | 100 : 30 : 19 | 16 sec | 15 min |
*Pot life data referenced with 5% thinner added (TDS note).
Surface Preparation (TDS Reference)
- Sanding process: P240 (as listed for putty/paints/OEM/cataphoresis)
- Non-sanding process prep: P400
- Degrease: DA93
Spray Setup & Application (HVLP)
| Mode | Tip | Pressure | Coats | Flash (20°C) |
|---|---|---|---|---|
| High Build Filler | 1.7 – 1.9 mm | 2 – 3 bar | 2 | 5 min |
| Primer Surfacer | 1.5 – 1.7 mm | 2 – 2.5 bar | 2 | 5 min |
| Non-Sanding | 1.3 – 1.4 mm | 2 – 2.5 bar | 1–2 | 3 min |
Drying Times (P5000 Standard) — TDS Reference
- Flash-off before force drying: Min 15 min / Max 60 min (reference table).
- Air dry @ 20°C: High build filler 2 h • Primer surfacer 1.5 h • Non-sanding > 1 h.
- Force dry @ 60°C: 30 min (P4000–P5000 reference table).
- IR (short wave) reference: distance 80 cm • flash off 5 min • full bake 7 min.
- Note: In case of superficial imperfections, sanding is indicated after 15 min at 20°C.
Sanding Recommendations
- High build filler: Initial P360 → Final P600
- Primer surfacer: Initial P400 → Final P600
- Microfine finishing: Initial P600 → Final P800 (and up to P1000 where applicable)
Cleanup, Storage & Shelf Life
- Equipment cleaning: clean with a cleaning thinner before the product hardens.
- Storage (TDS): store ventilated, away from sunlight, between +5°C and +30°C.
- Shelf life (TDS): 1 year in unopened original packaging.
Safety (SDS Highlights — Pro Use)
- Multyfiller Express (mixture classification): H226 Flammable liquid and vapour • H315 Causes skin irritation • H373 May cause damage to organs through prolonged or repeated exposure • H412 Harmful to aquatic life with long lasting effects.
- P5000 Standard Hardener: For professional/industrial use only. Hazard statements include H226, H315, H317, H319, H332, H335, H336, H373, H412 + EUH204 (contains isocyanates; may produce an allergic reaction).
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
